VERSIRENTALSEquipment Rental & Sales
What You'll Need

What Equipment Do I Need to Build a Deck?

Mini excavators or augers for frost-depth footings, trailers for lumber, and when a compact telehandler actually helps a Utah deck build.
Job site5 min read

Most ground-level decks in Utah are an auger (or a mini), a plate for any gravel landing, and a trailer for lumber and spoils. Elevated decks add frost-depth holes and maybe a compact telehandler for beams. A 44 ft 8k in the backyard is how you explain a new sod bill to the owner.

In This Guide

  1. 1.Equipment for building a deck
  2. 2.Holes before lumber
  3. 3.Material
  4. 4.When height appears
  5. 5.FAQ

Holes before lumber

Frost-depth piers (often ~30 inches, check the print) in this soil are not a weekend clamshell job once you hit cobble. A skid-steer auger on a T550 is fast in friendly dirt. A mini excavator is faster once the auger starts polishing rock. Do not guess — 811 first.

Material

A 6×12 dump or an Airtow utility trailer beats five truckloads of PT through the house. Composite packs are palletized; forks on a compact telehandler help if you cannot get a truck behind the house.

When height appears

Second-story decks and covered porches sometimes want a 19 ft scissor on a patio slab, or a compact telehandler for beams. They do not want a construction boom because the railing “felt high.”

FAQ

Auger or mini excavator for deck footings?
Auger in clean soil. Mini as soon as you hit cobble, roots, or a footing that has to be square. Many jobs start with the auger and switch.
Do I need a scissor lift?
Rarely for a standard deck. Covered second-story work over a slab is the exception. Ladders still win for a lot of decking and railing.
HOA backyard access?
Measure the gate. E35-class minis fit more side yards than people think; 8k telehandlers do not. Send a photo.

Need a quote on the right class?

Call or text — we'll match height, width, and capacity to the job instead of renting you a bigger machine than you need.